Same-day emergency repairs · Cranbourne · Berwick · Narre Warren · Call (03) 9003 0250
Installation day · Cranbourne & the City of Casey

Garage door installation day in Cranbourne, hour by hour: what happens and what you need to do

A single garage door swap takes 3 to 5 hours and a double takes 5 to 7, start to finish, in one visit with two installers on site. We arrive between 7:00 and 8:30, the old door is off inside 90 minutes, and the longest single stage is hanging the tracks and panels. You need the driveway clear, a working 10 amp power point within about 1.5 metres of the motor head, and everything within 2 metres of the opening moved. The two things that turn one day into two are an out-of-plumb jamb and no power at the ceiling.

The timeline

Every stage, how long it takes and what is expected of you

Times below are for a standard double opening around 4,800mm by 2,100mm in Cranbourne, Berwick, Narre Warren, Hampton Park or Endeavour Hills, with two installers on site. A single opening runs roughly 60 to 70 per cent of these times. Costs for each part of the job are on the pricing page.

Stage How long What happens What you need to do
1. Phone triage 10 minutes, on the phone We work out door type, rough size, whether the opener is coming too, and give an indicative range before anyone drives anywhere. Have the door brand and rough age handy. The sticker is usually inside the top panel or on the motor head.
2. On-site measure 30 to 45 minutes, free Opening width and height in three places each, headroom, side room, backroom, jamb plumb, lintel condition, driveway fall and where the power point is. Be there, and clear enough space for a tape measure and a ladder. Decide roughly on colour.
3. Quote and order Quote in 48 hours, then 5 to 10 business days for a stock door, 3 to 5 weeks non-stock Fixed written quote, then the door is ordered and a fitting date is locked in. Read the quote against the checklist below, approve in writing, and check your estate covenant if the colour is unusual.
4. Arrival and set-up 15 to 20 minutes Van and trailer park on the driveway, drop sheets down, tools out, the door delivered off the trailer and laid flat. Driveway completely clear, both cars out on the street or around the corner. Dogs inside.
5. Old door out 45 to 90 minutes Springs de-tensioned first, then the curtain or panels come down, then tracks and brackets. This is the loud stage if the brackets are rusted or dynabolted. Stay out of the garage. The opening is unguarded and old counterbalance hardware is under load until it is released.
6. Opening prep 30 to 60 minutes, sometimes longer Jambs checked for plumb and packed, rust or rot at the fixing points dealt with, lintel checked, old anchor holes made good. This is the stage that stalls jobs. Nothing, but expect a conversation if the jamb has moved more than about 15mm or the timber is soft.
7. Tracks and door in 90 minutes single, 2 to 3 hours double Vertical and horizontal tracks fixed and aligned, panels stacked and hinged, or the curtain and barrel lifted into brackets. Longest stage of the day. Keep kids and pets out. Panels are handled at height and a gust through the opening moves them.
8. Springs and balance 30 to 45 minutes Torsion springs wound to the calculated turns, then the door is balance-tested by hand at three heights so it stays put wherever you leave it. Nothing. Nobody should be inside the opening during winding.
9. Opener and safety 60 to 90 minutes Rail and motor head hung off the joists, arm connected, photoelectric safety beams set at 150 to 200mm above the slab, wall control run, limits and force set. Make sure there is a working 10 amp power point within about 1.5 metres of the motor head. If not, this stage stops.
10. Test and handover 30 to 45 minutes The door is cycled about 30 times, auto-reverse tested against an obstruction, beams broken and re-tested, remotes and keypad coded, app paired, manual release demonstrated. Be present. Watch the safety reverse yourself and practise the manual release once with your own hands.
11. Clean-up and waste 20 to 30 minutes Magnet sweep of the driveway and slab for swarf and screws, offcuts and packaging bagged, old door and hardware loaded, invoice and warranty issued. Walk the driveway with us before we leave and check the slab where the old door sat.

Two installers, one visit. Same-day emergency repairs are a different job entirely and usually take 60 to 90 minutes. Call (03) 9003 0250.

Before we arrive

Your prepare-for-the-crew checklist

Tick these off and the job runs on time. Your ticks are saved on this device, so you can come back to the list, and the print button gives you a clean copy for the fridge.

The week before

The night before

On the morning

Before the crew leaves

Stop and call us if you see this on the day

Want a date in the diary?

Free measure within 48 hours across the inner Casey ring, then a fixed written quote and a fitting date you can plan around.

The practical details nobody tells you

Access and parking

We need the driveway for the van and the trailer, plus about six metres of kerb in front of the house. In the newer courts around Cranbourne East and Clyde-side, where the road narrows and cars are parked on both sides, that is the number one cause of a slow start. If your street is tight, park both of your cars a few doors up the night before rather than the morning of. Panels are carried in flat, so we also need a clear path from the trailer to the opening at least a metre wide.

Power and water

The crew runs off your power for a battery charger and occasionally a grinder, so a working outdoor or garage power point is needed. More importantly the opener needs its own 10 amp general power outlet within about 1.5 metres of where the motor head hangs. If there is not one, that is a separate job for a licensed electrician, who has to issue a Certificate of Electrical Safety for the new circuit under Victorian electrical safety law. We do not do electrical work and we will not run an extension lead across the ceiling as a workaround. No water is needed at any point.

Noise, dust and smell

Loud in bursts rather than loud all day. An impact driver runs on and off through most of the job. An angle grinder comes out for one or two minutes at a time when rusted brackets or old dynabolts have to be cut, and that is the noise you will hear through the whole house. Winding springs is almost silent. There is no wet trade, no cutting of masonry unless a new anchor is needed, and no smell beyond a little cutting oil and the odd whiff of hot metal. The one genuine mess is fine steel swarf from cutting track, which rusts if it lands on a car bonnet or sits on a wet slab.

Pets, kids and working from home

The opening is unguarded from the moment the old door comes off until the new one is balanced, which is most of the day. A double sectional weighs 75 to 160kg and a roller curtain 55 to 80kg, and both are handled at height. Dogs and cats need to be behind a closed internal door, not just in the backyard, because the side gate gets used. Kids can watch from the front lawn but not from inside the garage. Working from home is genuinely fine in a front room, and most people take their calls between the noisy bursts, but do not book anything critical for the hour the old door comes off.

What has to be moved

Everything within two metres of the inside of the opening, across the full width. Everything hanging on the walls either side, because the vertical tracks need clear wall from the slab to the head. And everything on the ceiling along the door’s travel line, which runs back from the opening by the door height plus about 800mm: that is the door height in your case, plus the rail and the motor head. The item that catches people out in Casey is the ceiling storage platform or the roof-rack hoist. If it is over the track line it has to come down, and it is much cheaper for you to do that than for us to.

Weather

Wind stops more Melbourne jobs than rain does. A 2.4 metre panel going into a track is a sail, and a gusty northerly above about 40km/h makes that unsafe to handle at height, so panel work waits until it eases. Steady rain driving straight into the opening stops track fixing, because chemical anchors need a dry hole to cure properly. Light rain on a sheltered opening is a non-event. If the forecast is going to move your booking we call by 6:30am, not at 9 when we were due.

What a clean site looks like at the end

A magnet run over the driveway and the slab, no swarf in the joints of the pavers, no screws or offcuts, packaging bagged and gone, no cardboard in your bin unless you asked for it. Drop sheets picked up. The slab where the old door sat swept, because there is usually a line of grit under an old bottom seal. Remotes labelled and working. The manual release cord at a height you can reach. Your tax invoice with the ABN, the written workmanship warranty and the manufacturer paperwork handed over, not emailed next week.

Where the waste goes

The old door goes on the trailer. Steel curtains, panels, tracks, brackets, springs and cables are all scrap steel and go to a metal recycler, which is also why the disposal fee is modest at $180 to $380. The old motor head is e-waste, and e-waste is banned from landfill in Victoria, so it goes to a resource recovery centre rather than the tip face. Packaging cardboard and plastic strapping are recycled. The only part with no good local stream is the expanded polystyrene core in some older insulated panels, which we are straight about. Nothing is left on your nature strip.

When this whole day is the wrong job

If the panels are straight and the door is under about ten years old, and the only real complaint is that it is noisy, slow or ignoring the remote, you do not need an installation day. That is a 60 to 90 minute repair or a 90 minute motor swap, and it costs $250 to $1,400 rather than thousands. Start at why the door will not open or book a service.

There are also two things we will not do on the day, and it is better you know now. We do not carry out electrical work: if a new outlet is needed, a licensed electrician does it and issues the certificate. And we do not rebuild structure. We will pack and re-plumb a jamb that has moved, but a rotted timber frame, a cracked lintel or a widened opening is a carpenter or builder job with a building permit attached, and we will stop and tell you rather than fit a door to something that is not sound. The local trades list is the place to start for that.

If you are still choosing, the two decisions that come before booking a date are on choosing a garage door material and the budget page. Full service detail is on garage door installation.

Installation day questions

How long does a garage door installation take in Cranbourne?
A single door swap in an existing opening takes 3 to 5 hours and a double takes 5 to 7, done in one visit by two installers. Add 60 to 90 minutes if the opener is being replaced at the same time. The only jobs that run into a second morning are ones where the jamb has to be rebuilt or where there is no power point near the motor head and a licensed electrician has to come back.
What do I need to move before the crew arrives?
Everything within 2 metres of the inside of the opening, everything hanging on the walls either side of the door, and everything on the ceiling along the line the door track will run, which is the door height plus about 800mm back from the opening. That means bikes on wall hooks, roof racks slung from the joists and any storage platform above the opening. Cars go out of the garage and off the driveway.
How noisy and messy is a garage door install?
Loud in short bursts rather than loud all day. Expect an impact driver most of the time and an angle grinder for 1 or 2 minutes at a stretch when rusted brackets or old dynabolts have to come out. The mess is fine steel swarf from cutting track, which will rust if it lands on a car bonnet, so move both cars off the driveway. Across the whole 5 to 7 hours there is no water, no wet trade and almost no dust.
Do I need to be home for the whole installation?
No, but you do need to be there at the start and at the end. Ten minutes at the start to confirm the colour, the handset count and where the wall control goes, and about 20 minutes at handover to watch the safety reverse test, learn the manual release and pair the app. Plenty of Casey customers work from home through the middle of it, which is fine in a front room.
What happens to my old garage door?
It goes on the trailer and out to a metal recycler. A steel door, its tracks, springs and cables are all scrap steel and are recycled. The old motor head is e-waste, which cannot go to landfill in Victoria, so it goes to a resource recovery centre. The only part with no good local recycling stream is the polystyrene core in some older insulated panels. Removal and disposal runs $180 to $380.
Will weather delay my garage door installation?
Wind delays jobs far more often than rain does in Casey. A 2.4 metre panel being lifted into a track is a sail, so a gusty northerly above roughly 40km/h stops panel work until it eases. Steady rain blowing straight into the opening also stops track fixing, because chemical anchors need a dry hole. We call by 6:30am if the forecast is going to move your booking.
Get a price

Book the measure and get a fitting date

Send your details and we will call within one business day to book a free measure, then confirm a fitting date and a fixed price in writing.

We reply within 1 business day. Free, no obligation.

One visit, one crew, one clean driveway

Installations across Cranbourne, Berwick, Narre Warren, Hampton Park and Endeavour Hills. Old door removed and recycled as part of the job.

Call (03) 9003 0250